Home> News> Article

Leyard LED screens add flexibility to 24/7 studios at Slovakia’s TV Markíza

2024-10-25 13: 51

Independent Slovakian Broadcast company, TV Markíza recently installed a Leyard TVF video wall in its news studio and Leyard CarbonLight CLI and CLI Flex screens in The Morning Show studio. The fine pitch LED displays add functionality and flexibility to the 24-hour, multi-use studios, allowing TV Markíza to switch between news, weather or morning chat show layouts.


Leyard’s association with the broadcaster dates back to 2017, when three Leyard TVH series video walls were installed for the news studio. Leyard was then chosen as the supplier for the studio’s 2019 expansion, but the project was delayed due to the pandemic, with the installation of the Good Morning studio completing at the end of 2020.

Leyard believes that TVF is a good solution for broadcast applications, thanks to its fine pixel pitch, front serviceability and stackable design that eliminates cabinet-to-cabinet cabling. Easy front access also reduces the space required for the screens, while a low heat output ensures a comfortable working environment for presenters and guests.

On camera, the Leyard TVF Series boasts low latency coupled with high refresh rates. The gentle curve of the wall in the news studio is possible thanks to the stackable frame design of the modules, providing a flexible backdrop.

Talks about the renovation of the news studio began in September 2022. Based on their long-term cooperation, TV Markíza once again approached Leyard to work with the architect on a solution.

Jaroslav Holota, the main architect for the project, added: “Another factor was that Leyard’s European manufacturing facility and head office is in Slovakia. This gives us the flexibility of local support and no language barrier. It’s a massive benefit.”

The locality of Leyard’s manufacturing facility also meant that cost-effective testing was easy to facilitate.

Holota added: “The project was originally planned for completion later this year, but with two elections and other events in the pipeline, they brought it forward. The installation of the new TVF wall was completed last summer, to coincide with when the studio was less busy.”

 

TrendForce 2025 Global LED Video Wall Market Outlook and Price Cost Analysis

Release Date: 30 September 2024
Language: Traditional Chinese / English
Format: PDF
Page: 302

If you would like to know more details , please contact:

Global Contact:
 
ShenZhen:
Grace Li
E-mail :  Graceli@trendforce.com
Tel : +886-2-8978-6488 ext.916
  Perry Wang
E-mail :  Perrywang@trendforce.cn
Tel : +86-755-82838931 ext.6800
Recommended Article